Our field of expertise
Mobilization of a cable repair vessel
Saltwater Engineering was contracted by N-Sea to assist in the mobilization of the Curo. For this cable repair vessel, items such as a carousel, loading tower, chutes etc. had to be sea fastened and the deck strength had to be verified. As the foundations of most items had already been built, there was limited space to modify those foundations to guarantee the structural integrity of the vessel. With good communication with the client and sub-contractors, the project was completed within the set time frame.
Our team of engineers were invited by N-sea to see their work in action. These opportunities are invaluable for our engineers, providing crucial feedback to enhance future mobilizations.
At Saltwater we don’t just work from the office! We believe in hands-on precision, which is why our engineers are ready to come onboard your vessels to perform essential measurements and checks. This ensures that every solution we provide is tailored to the exact needs and conditions of your vessel.
Specific project data
Project information
Scope of work:
- Seafastening
- Deckstrength calculations