Winch and LARS foundation
Saltwater was contracted by Fugro for the engineering support for the mobilisation of the Gargano. The A-frame is to be placed onboard the Gargano for final SAT testing. The challenge is to complete the engineering from blank page to production drawings in just three days.
Foundation
For the foundation of the A-frame, parts of the FAT tested frame are to be used to speed up production. The winch is an existing unit but requires a whole new foundation.
Gargano
The Gargano is a 72m dynamically positioned supply vessel with an aft cargo deck extending to 640m2. The vessel is built in 2002 and since 2009 in several geotechnical investigation projects.
Specific project data
Project information
Scope of work:
- FEM calculations to determine the structural integrity of the winch foundation
- FEM calculations to determine the structural integrity of the A-frame foundation
- FEM calculations to determine the structural integrity of the deck
- Weld calculations